HS Optimus made the redesign and revision of second-generation turbine generator with a power increase to 3 kW. The generator goes into production immediately and is scheduled for completion within a month. These micro power plants will be placed first for testing and then we will start the commercial exploitation of this device.

Be sure to check back later to see the results of the tests and for the possibility of ordering the same device. The device is made in cooperation with Arming Ltd.

Arming d.o.o.

render turbinski generator.1 render turbinski generator.2 render turbinski generator.3 render turbinski generator.6

HS Optimus Engeneering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.